KamoCRM

The Repeat field says what a series save does; no repeat for a lead callback

Fixkamo-internal
Se descapó
25 de septiembre de 2026 a las 18:10 UTC
Autor
Kamo
Compromit
a5b2897

The repeat now follows a move of the start's date, as the calendar service moves a series: a weekly repeat's days move with it, and an existing series' end date too. An edit sends the repeat when what the field states differs from the series' own, compared as the service receives it, so a monthly series moved from the 5th to the 6th sends 'day 6' instead of nothing. A rule the editor cannot state goes out only when the member changed it. Moving one instance's date still offers 'This event'. A lead callback opened on /calendar has no Repeat field and sends no repeat. Final review SP07, IMPORTANT 2 and 3.

Todos los cambios

Como lo que ves enviaste?

Todo llega a su espacio de trabajo por sí solo. Comience en el plan gratuito y lea esta página de nuevo en un mes.

Arranzar gratis para siempreVer Precios